Get Ready for Cold Weather with Get-Set™

Get-Set™ from VCNA is a cold-weather concrete accelerator designed to achieve quicker, more predictable set times during winter pours. It enables placement at temperatures as low as -7°C while maintaining excellent surface appearance and finishing characteristics.

Accelerated Set Time in Cold Conditions

Get-Set™ speeds up concrete set times by up to 35%, countering delays from temperatures between -7°C and +7°C, where normal concrete can take over 16 hours to finish.
GetSet_41

Brochures

Please select listing to show.
Download the Get-Set™ brochure

Key Benefits

background ribbon

Cost Savings

Reduces extra labour, overtime, equipment, heating, and rescheduling expenses associated with cold-weather delays.​

background ribbon

Improved Finishing

Delivers excellent surface appearance and enhanced finishing characteristics, even in fluctuating ambient temperatures.​

background ribbon

Project Efficiency

Enables on-schedule completion in winter, turning seasonal delays into ahead-of-schedule finishes.

Frequently Asked Questions

Get-Set™ permits concrete placement at temperatures as low as -7°C, ideal for cold weather conditions.

It accelerates set times by up to 35%, providing more predictable results compared to standard concrete in cold weather.

It is suited for any cold-weather concrete pour, such as slabs, walls, or infrastructure projects where delays from slow setting are a risk.

Want to Learn More About Get-Set™?

Contact our technical experts for dosage guidance, mix compatibility, and cold-weather project support.

Contact Us

GetSet_32